Senator Adeola YAYI Moves to End Blackout in Ogun Communities with 12 Power Projects

Spread the love

By

 

The listed projects for execution include:

*Reactivation of Ilaro to Ibese 33KV Overhead Lines

*Reactivation of Ibese to Dangote 33KV Overhead Lines

*Reactivation of (Dangote) Ibese to Joga 33KV Overhead Lines

*Reactivation of Isaga Junction to Ibara Orile and Isaga 33KV Overhead Lines

*Reactivation of (Dangote) Ibese to Igbogila 33KV Overhead Lines (118 spans)

*Reactivation of Igbogila to Ayetoro 33KV Overhead Lines

*Reactivation of Igbogila to Ijoun 33KV Overhead Lines

*Reactivation of 33KV Overhead Lines from Federal Polytechnic, Ilaro to Oja Odan through Ebute Igbooro (331 spans)

*Construction of a dedicated 33KV feeder to Ilaro Township from Papalanto Transmission Station

*Construction of Owode Feeder from Ota Transmission Station to Owode River Bridge, including maintenance works along:

*Idiroko – Ipokia – Akere – Yewa

*Aferiku Town, Tube – Ode Pata – Agada – Igua

*Agosasa – Bode Ase – Idosemo – Idosa – Ijofin

*Oke-Odan – Eyeknase Isagbo – Oke Ijako – Owo

*Ita Atan – Ilase Junction

*Owode ,Ajilete Inside – Ihumbo ifoyintedo, Alari – Idiroko

*Iwoye Owode

*Agosasa – Tube – Igude

*Supply and Installation of 500KVA 11/0.415KV Transformer at Onikoko, Abeokuta

*Supply and Installation of 500KVA 11/0.415KV Transformer at Kings Dominium Street, Off Kuforiji Olubi Road, Saraki Area, Adigbe, Abeokuta

*YAYI UNSTOPPABLE*
*YAYI PHENOMENAL*

Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x
×